Markdown Version | Session Recording

Session Date/Time: 06 May 2025 16:00

LSVR

Summary

The LSVR Working Group held an interim meeting to discuss the liaison statement received from IEEE 802.1 concerning Layer 3 Discovery (L3DL) and consider the technical merits of using LLDPv2 as an alternative for LSVR's discovery and configuration requirements. Presentations were given on the LLDPv2 multi-frame approach, a comparison of L3DL and LLDP, and open issues in the L3DL draft. The discussion highlighted the need for further technical analysis and collaboration on the mailing list, particularly regarding potential gaps in the LLDP-based approach and the implications of L3DL's Layer 2 aspects.

Key Discussion Points

Decisions and Action Items

No formal decisions were made on the protocol choice for LSVR discovery. The discussion led to the following action items:

Next Steps

  1. Mailing List Discussion: The primary next step is to continue the in-depth technical discussion on the LSVR mailing list, focusing on the comparative analysis of LLDP and L3DL, and specifically identifying any LSVR requirements that an LLDP-based solution might not fulfill.
  2. Liaison Reply: Based on the mailing list discussion, the working group will formulate a comprehensive reply to the IEEE 802.1 liaison statement.
  3. Potential Joint Meeting: A joint meeting with IEEE 802.1 in Madrid will be considered if further in-person discussion is deemed necessary after the mailing list exchange.
  4. Protocol Decision: Following these discussions and considerations, the working group will aim to make a decision on the mechanism for LSVR discovery and liveness.