Markdown Version | Session Recording
Session Date/Time: 28 Mar 2023 04:00
core Meeting - IETF 116
Summary
This core working group meeting at IETF 116 covered a wide range of topics related to constrained resource environments, including Concise Resource Identifiers (Cli), conditional attributes, key update mechanisms (Kudos), publish-subscribe architectures, DNS over CoAP, and performance measurement. Individual submissions on CoAP over BLE, CoAP yacht, and a data model for at-hoc SCORE were also presented. The meeting included document status updates, technical discussions, and a brief discussion on the future direction of several drafts.
Key Discussion Points
- Cli (Concise Resource Identifiers):
- Registration of URI schemes as negative integers was discussed. Concerns about the procedural aspects of this registration were raised.
- Handling of percent encoding in Cli extensions was discussed. The need for clarity on how to handle CsiIs with unknown extensions was noted.
- Discussions on representing empty paths (empty array vs. trailing null) and the need for both representations were documented.
- The burden on implementations for strict checking of certain constructs was discussed.
- Conditional Attributes:
- The discussion centered on whether the document should be informational or standard track. The importance of considering existing implementations (e.g., in K x Iot) and potential conflicts was highlighted.
- The clash with the "observe" functionality and a proposal to use resource state projection to address this was discussed.
- Cancellation of resource projection registration via URI with conditional attributes was also discussed.
- Using Adequate Core Panel Core:
- Discussion and changes related to payload format, context creation, error handling, target attributes, and authentication credential types.
- The working group is ready for shepherd review and write-up.
- Key Usage Limits for Os and Key Update for Score (Kudos):
- Key Usage Limits were separated to a new draft.
- Discussion on how a PS can update their score and recipient Ids, using a new core option.
- The optionality of end yi them kudos to Cd and how peers can also rely on signalling with the no forward bit was mentioned.
- Discussion about preventing deadlocks.
- Pubsub:
- Discussions on topic properties, the importance of max subscribers, and the fact that its an authorization error not just the protocol mechanism.
- YANG and CoAP (sid and Kumar):
- Discussion on the sit location mechanism, the challenges with Jane 2 landscape, and the need for a complete set of data notes.
- Handling multiple versions of zip files and the option of overriding the old one, to avoid causing problem.
- Full data store access and the data node access operation was discussed.
- DNS over CoAP (DoC):
- Addressed DNS directorate feedback and clarified terminology. Discussed implementation of DNS push and transport agnosticism.
- Started addressing feedback from ten s up, covering performance advantages, T rewriting, and cache optimization.
- Discussion to bootstrap dock in a SRV record and also opened a discussion on the mailing list.
- CoAP Platform Performance Measurement:
- Discussions on proxy and safe operations in regards to proxying.
- Presentation of different scenarios, including D and Oscar.
- CoAP over BLE:
- Introduced a very short header, with tokens similar to what we know from other transports.
- The need for discovery topic was discussed and what has to be reviewed by the end user.
- Data Model for At-hoc SCORE:
- Presentation of an architecture on how to configure security associations.
- Presented two cases, the thing has the at hoc score implementation or just score.
Decisions and Action Items
- Conditional Attributes:
- Action Item: Bill to discuss the informational vs. standard track status with K x Iot and Dms.
- Using Adequate Core Panel Core:
- Action Item: Jacob to upload the issue to the issue tracker on talk.
- Using Adequate Core Panel Core:
- Action Item: Chair to discuss with the shepherd review and write-up.
- CoAP Platform Performance Measurement:
- The document will move forward with the working group adoption code.
- Action Item: Christian to copy with Ipm and point some cautions about traffic.
Next Steps
- Cli: Further discussion on remaining questions on the mailing list and at the next interim meeting.
- Conditional Attributes: Await outcome of discussions with K x Iot and Dms regarding the document's status.
- Sid and Kumar: Incorporate feedback from discussions and continue development.
- All Documents: Authors to address open pending points and solicit feedback on mailing lists.
- Interim Meetings: The group plans to resume interim meetings every other Wednesday in the European afternoon starting from April twenty six. A confirmation will be sent through the mailing list in one week.