Markdown Version | Transcript | Session Recording | Session Materials

Session Date/Time: 24 Jul 2026 07:00 ✎ Suggest a correction

CCAMP

Summary

The CCAMP Working Group met at IETF 126. The session covered the status of active working group drafts, liaison agreements, and progressed several key items, including DWDM interfaces, WDM tunnels, Microwave links, and performance monitoring streaming. The working group also discussed several new proposals addressing the intersection of optical networks, service level agreements (SLAs), and artificial intelligence (AI) computing orchestration.

The agenda was bashed prior to the session to accommodate traveling constraints, moving the Microwave Radio Link presentation to the third slot.


Key Discussion Points

1. Admin & Working Group Status


2. DWDM Interface Parameter YANG


3. WDM Tunnels YANG


4. Microwave Radio Link


5. WDM Pluggable Modelling


6. CMIS Access and Control


7. Performance Monitoring Streaming


8. Integration of Network Management Agent (NMA) into ACTN


9. SLA Assurance Management in Optical Transport Networks


10. OSPF-TE Extensions for Computing Capability Advertisement


11. Optical Networks and AI Computing Orchestration (ONCO)


Decisions and Action Items


Next Steps

  1. Progress draft-ietf-ccamp-dwdm-if-param-yang to WGLC once the minor updates are published.
  2. Launch the working group adoption call for the Microwave Radio Link draft after resolving the IPR list.
  3. Monitor IPPM's adoption of the PM streaming framework to trigger the subsequent CCAMP PM streaming adoption.

Related Documents

draft-ietf-ccamp-dwdm-if-param-yang, draft-ietf-ccamp-fgotn-yang, draft-ietf-ccamp-wdm-tunnel-yang